Construction of High Level Bridge across Jamini River on Tikamgarh-Jhansi road at km. 74/6 (NH-539) in the State of Madhya Pradesh. (Total Length: 840 m ) on EPC mode
Construction of High Level Bridge across Betwa River on Orchha-Tikamgarh road at km. 81/2 (NH-539) in the State of Madhya Pradesh. (Total Length: 436 m (Structure part) + 290 m (140 m + 150 m) approaches)PWD NH DIV. SAGAR
Construction and Upgradation of rural roads under the PMGSY for Pkg No. MP45703
Upgradation And Reconstruction under NDB-|| Package-2 Mahidpur to kachhaliyachand bia jharda-Kundikheda -Naggurdiya -lalgarh Road Length 21.575 KM. Sunera-khoriya Aima-Badodiya road length 20.46 km. and Amla-nalkheda road length 13.66 km. Total Length 55.695 KM. NH Division No 2 Bhopal
Reconstruction of 6 nos submersible/narrow/distressed bridge on jabalpur - dindori section of nh-45 Ext on EPC Mode Work order is of Rs 20.07 crore
Widening to 2Lane/4Lane of existing flexible pavement i/c Construction of bridges and culverts in Sagar City from KM 175.00 to KM 187/6_4L 10 KM and 2L-1.6KM of Bhopal-Sanchi-Sagar Section on NH86 Ext. Road in the State of M.P. - PWD (MP)
Widening & Upgradation of Shajapur Bercha road to Lahori Devla length 34-55 KM
Mahidpur to kachhaliyachand 55km , MPRDC Ltd. Govt of MP.
Four Lane of Gwalior-Shivpuri section of NH-3 , NHAI, MoRTH, Govt of India.
Construction of Hinotiya, Bamnal,Kirangl Sarnsgarh, Machgwasani Road Length. 80.. KM
Work of road In Raisen Distirict From SH-15 Silwani And SAGAR Road
Construction of Dehra Bridge
Copyright 2020 www.akshivhare.com All rights reserved with A. K. Shivhare Infrastructure Pvt. Ltd.
Design & hosted by Bhopalone